News

  • 17/07/2007

    Umicore-BrazeTec brazes Audi Q7

    More...

More news...

Professional events!

  • Umicore BrazeTec @ IAA Hanover

    From 25.09. to 02.10. Umicore BrazeTec will attend the IAA Commercial Vehicles show 2008 in Hanover.

    Read more...

  • Chillventa Nürnberg

    Please visit us at the Chillventa in Nuernberg from September 15th till 17th, 2008

    Read more...

  • Umicore BrazeTec @ IWF in Atlanta

    Umicore BrazeTec will exhibit at the IWF Trade Show - August 20 to 23 in Atlanta.

    Read more...

Fairs and events

Base of a hot water boiler

 

This photo shows a stainless steel boiler for hot water. The copper pipes fitted in the boiler for heat supply are joined to the boiler wall with a brazed connection. The flame brazing method was used here. The automatic feeding of the brazing alloy and the feeding of the flux paste can clearly be seen.


We recommend BrazeTec 6009 silver brazing alloy for this copper to stainless steel connection. This has a working temperature of ca. 720°C. BrazeTec spezial h flux can be used.

 

© 2007 - Umicore -  Legal notice -  Impressum -  Allgemeine Geschäftsbedingungen  -  Hinweise für den Spediteur